EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
NewtonRV-14A
-
Listing for Category : 17:outbd ldgedge
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (478)
Research
Workshop
- (3)
-
Portable Evaporative...
-
Build Worktables
-
Built/Completed...
Empennage
- (8)
-
Paid for Freight on...
-
Inventory
-
Tail Kit Arrived
-
Crate Date - Empennage
-
Ordered Tail Kit
-
Submitting Final...
6: Vert Stab
- (8)
-
Cleco Vs structure...
-
Match drill the skin...
-
Disassemble vstab...
-
Debur and Prime...
-
Debur and Prime Vert...
-
Dimpled vstab skin...
-
Dimple the vstab...
-
Complete Vstab...
7: Rudder
- (27)
-
Begin Rudder...
-
Continue prepping...
-
Fitted and Match...
-
Finished Prepping...
-
Debur Rudder...
-
Fitted Skins and...
-
Drill Trailing Edge,...
-
Scuffed the inside...
-
Dimpled Skins and...
-
Ordered Replacement...
-
Primed rudder skins...
-
Back Riveted Rudder...
-
Riveted two halves...
-
Deburred, primed,...
-
Rivet doubler and...
-
Assembled and...
-
Pulled and prepared...
-
Cut and prepped spar...
-
Debur Front Spar
-
Fit and Drill 1 of 2...
-
Cleco rudder...
-
Riveted lower rib...
-
Riveted Rudder Skins...
-
Riveted top rib and...
-
Rolled and Riveted...
-
Drilled out rivets...
-
Rolled Rudder...
8: HorizStab
- (15)
-
Deburred Replacement...
-
Drilled Front Spar
-
Deburred all parts...
-
Begin prepping Hstab...
-
Prepping HStab Ribs
-
Prepping HStab Ribs
-
Prepping hstab ribs
-
Hstab: dimple ribs,...
-
Hstab: dimple and...
-
Hstab: begin...
-
Hstab: rivet ribs to...
-
HStab: Begin...
-
Hstab: rivet nose...
-
Hstab: finish...
-
Hstab: completed...
9: Elevator
- (42)
-
Elevator: Begin...
-
Elevator: Rib Prep
-
Elevator: Finish rib...
-
Elevator: prep one...
-
Elevator: completed...
-
Elevator: Cut foam...
-
Elevator: Pulled...
-
Elevator: debur...
-
Elevator: finish...
-
Elevator: cleco most...
-
Elevator: prep and...
-
Elevator: drill...
-
Elevator: Finished...
-
Elevator:...
-
Elevator: Deburring...
-
Elevator: deburring...
-
Elevator: Complete...
-
Ordered Replacement...
-
Elevator: debur and...
-
Elevator: Dimpled...
-
Elevator: finished...
-
Elevator: Dimpling ribs
-
Elevator: trim...
-
Elevator: drill out...
-
Elevator: trim tab...
-
Elevator: prime trim...
-
Elevator: prep...
-
Elevator: prep right...
-
Elevator: prep left...
-
Elevator: prime left...
-
Elevator: finish...
-
Elevator: rivet tip...
-
Elevator: rivet...
-
Elevator: rivet...
-
Elevator: riveting...
-
Elevator: Rivet...
-
Elevator: riveting...
-
Elevator: finish...
-
Elevator: adhere...
-
Elevator: assemble...
-
Elevator: finish...
-
Elevator:...
10:Rear Fuselage
11:Emp Attach
12: Emp Fairings
Wings
- (12)
-
Wings: AFS Roll...
-
Wing Kit Backordered...
-
Wings: Inventory List
-
Finish Inventory
-
Inventory
-
Inventory
-
Wings - Shipping Notice
-
Wings: Begin Inventory
-
Wing Kit Received
-
Freight Bill on Wings
-
Wings: Final Billing
-
Ordered Wing Kit
13:Main WingSpar
- (14)
-
Main Spar: FINISH...
-
Main Spar: install...
-
Main Spar: setup to...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Main Wing Spar:...
-
Making Wing Spar:...
-
Main Wing Spar:...
-
Main wing spar:...
-
Main Wing Spar: cut...
14: Wing Ribs
- (18)
-
Wing Ribs: Complete...
-
Wing Ribs: Attach...
-
Wing Ribs: Continue...
-
Wing Ribs: Attaching...
-
Wing Ribs: prime and...
-
Wing Ribs: match...
-
Wing Ribs: debur,...
-
Wing Ribs: prime and...
-
Wing Ribs: finished...
-
Wing Ribs: fitting...
-
Wing Ribs: finish...
-
Wing Ribs: prepping...
-
Wing Ribs: Pepping Ribs
-
Wing Ribs: prepping...
-
Wing Ribs: Prepping...
-
Wing Ribs: Continue...
-
Wing Ribs: built a...
-
Wing Ribs: begin...
15:Rear WingSpar
- (12)
-
Rear Spar: riveting...
-
Rear Spar: riveting...
-
Rear Spar: riveting...
-
Rare Spar: begin...
-
Rear Spar: Debur and...
-
Rear Spar: Debur and...
-
Rear Spar: Match...
-
Rear Spar: cut pass...
-
Rear Spar: Prepping...
-
Rear Wing Spar:...
-
Rear Wing Spar:...
-
Rear Wing Spar:...
16:Top Wing Skin
- (27)
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin: begin...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Too Wing Skin:...
-
Top Wing Skin: Begin...
-
Top Wing Skins:...
-
Top Wing Skins:...
-
Top Wing Skin:...
-
Top Wing Skin:...
-
Top Skins: dimple...
-
Top Skins: dimple...
-
Top Skin: finished...
-
Too Skin: debur...
-
Top Wing Skin:...
-
Top Wing Skins:...
-
Top Wing Skin:...
-
Top Skin: Begin...
17:Outbd LdgEdge
- (34)
-
Leading Edge:...
-
Outboard Leading...
-
Outboard leading...
-
Leading edge:...
-
Outboard Leading...
-
Outboard Leading...
-
Wings: Pitot Tube...
-
Leading Edges -...
-
Leading Edge:...
-
Leading Exge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: Cleco...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: Mask...
-
Leading Edge: Prime...
-
Leading Edge: Dimple...
-
Leading Edge: Dimple...
-
Leading Edge: finish...
-
Leading Edge: Rivet...
-
Leading Edge: Finish...
-
Leading Edge: finish...
-
Leading Edge: Debur...
-
Leading Edge: Remove...
-
Leading Edge: Remove...
-
Leading Edge: Finish...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge:...
-
Leading Edge: begin...
-
Leading edge:...
18:Fuel Tank
- (60)
-
Fuel Tank: finish...
-
Fuel Tank: Fitting...
-
Fuel Tank: final...
-
Fuel Tank: right...
-
Fuel Tank: fitting...
-
Fuel Tank: fitting...
-
Fuel Tank: Initial...
-
Fuel Tanks: Machine...
-
Fuel Tanks: Pressure...
-
Fuel Tanks: install...
-
Fuel Tanks: baffle...
-
Fuel Tanks: prepping...
-
Fuel Tanks: Water...
-
Fuel Tanks: Right...
-
Fuel Tank: finished...
-
Fuel Tank: fitted...
-
Fuel Tank: Locktite 565
-
Fuel Tanks:...
-
Fuel Tanks: install...
-
Fuel Tanks: Finish...
-
Fuel Tanks: Riveting...
-
Fuel Tanks: finished...
-
Fuel Tanks: Continue...
-
Fuel Tank: installed...
-
Fuel Tanks: finished...
-
Fuel Tanks: begin...
-
Fuel Tank: Dimple...
-
Fuel Tank: Drill out...
-
Fuel Tank: Ordered...
-
Fuel Tank: Prep left...
-
Fuel Tank: Finish...
-
Fuel Tanks: Prepping...
-
Fuel Tanks: prepping...
-
Fuel Tank: install...
-
Fuel Tank: finished...
-
Fuel Tank: Continued...
-
Fuel Tank: continue...
-
Fuel Tank: Begin...
-
Fuel Tank: rivet...
-
Fuel Tank: prep...
-
Fuel Tank: mounted...
-
Fuel Tank: finish...
-
Fuel Tank: finish...
-
Fuel Tank: dimple...
-
Fuel Tank: Finish...
-
Fuel Tank: right...
-
Fuel Tank: debur...
-
Fuel Tank: for left...
-
Fuel Tank: prepping...
-
Fuel Tank: finish...
-
Fuel Tank: Continue...
-
Fuel Tank:...
-
Fuel Tank: Debur...
-
Fuel Tank: cut,...
-
Fuel Tank: rivet nut...
-
Fuel Tank: debur,...
-
Fuel Tanks: cut,...
-
Fuel Tank: scuff,...
-
Fuel Tank: prep root...
-
Fuel Tank: Prepping...
19:Wing Sys Rtg
- (9)
-
Wing Systems Rtg:...
-
Wing Systems: tested...
-
Wing Sys Rtg: Finish...
-
WIng Sys Rtg: begin...
-
Wing Sys Rtg:...
-
Wing Sys Rtg: Begin...
-
Wing Systems...
-
Wing Systems...
-
Wing systems...
20:Bot Wing Skin
- (41)
-
Bottom wing skin:...
-
Bottom wing Skins:...
-
Bottom Skins:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bottom wing skin:...
-
Bottom Wing Skin:...
-
Bottom Wing Skin:...
-
Bottom wing skin:...
-
Bot Wing Skin:...
-
Bot Wing Skin:...
-
Bot Wing Skin: Right...
-
Bot Wing Skin: cleco...
-
Bot Wing Skin:...
-
Bot Wing Skins:...
-
Bot wing Skin: begin...
-
Bot WIng Skin: debur...
21: Flap
- (22)
-
Flap: complete left...
-
Flap: setback,...
-
Flap: bond trailing...
-
Flap: rivet skins,...
-
Flap: replacement...
-
Flap: finish...
-
Flap: finish right flap
-
Flap: rivet bottom...
-
Flap: rivet right...
-
Flap: finish...
-
Flap: Prime...
-
Flap: debur and...
-
Flap: Dimple...
-
Flap: expose skin...
-
Flap: Complete...
-
Flap: Countersinking...
-
Flap:finish final...
-
Flap: fitted...
-
Wings: Replacement...
-
Flap: finish...
-
Flap: Begin Flaps
-
Flap:deburr nose...
22:Aileron
- (20)
-
Aileron: Left/Right...
-
Ordered Replacement...
-
Aileron: tape &...
-
Aileron: countersink...
-
Aileron: rivet lower...
-
Aileron: prime skins...
-
Aileron: discovered...
-
Aileron: cleco both...
-
Aileron: Drill right...
-
Aileron: Drill Right...
-
Aileron: rivet ribs...
-
Aileron: debur,...
-
Aileron: drill...
-
Aileron: bolt...
-
Aileron: drill ribs...
-
Aileron: Cleco...
-
Aileron: Debur...
-
Aileron: Prime...
-
Aileron: counter...
-
Aileron: begin...
23:Aileron Act.
- (8)
-
Aileron Act.: Finish...
-
Aileron Act.: rivet...
-
Aileron Act: finish...
-
Aileron Act: build...
-
Aileron Act.: Begin...
-
Aileron Act: Build...
-
Aileron Act: Cut,...
24:Wing Tip
- (2)
-
Wing Tip: AVEO ZipTips
-
Wing Tip: Ordered...
38:Roll Trim
- (2)
-
Finish electric roll...
-
Roll Trim: Build...
57:AP Servos
- (3)
-
AP Servos: Complete...
-
AP Servos: Complete...
-
Aileron Act.: Begin...
Fuselage
- (6)
-
Fuselage: Inventory
-
Fuselage: Inventory
-
Fuselage: Paid...
-
Received Fuselage Kit
-
Fuselage: Final Payment
-
Ordered Fuselage Kit
Finishing Ki
- (1)
-
Finishing Kit:...
Firewall
Controls
Avionics
- (4)
-
Avionics: mount...
-
Avionics:...
-
Avionics: DSUB 9 Pin...
-
Avionics: Advanced...
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
-
Lycoming Thunderbolt...
Propeller
- (2)
-
Paid Balance on...
-
Ordered Hartzell...
Fuel System
Interior Finish
Paint / Decals
- (4)
-
SEM Primer
-
Primer - 6 Pack
-
SEM Primer 6-Pack
-
SEM 39683 Grey Self...
Inspection
Tools
- (26)
-
Tools: 4" thin...
-
Acrylic Drill Bits...
-
Tools: Rivet Cutter,...
-
Ordered C-Frame from...
-
3/16 Rivet Set
-
Tools: Rivet removal...
-
Home Depot: Clamps
-
Tools/Shop: Drill,...
-
Label Maker, Tape...
-
Swivel Flat Set and...
-
Back rivet bar,...
-
Ordered 5/32"...
-
Made "T"...
-
50a-15a Adapter,...
-
Rib Yoke for Squeezer
-
Cleaveland Tools:...
-
Cleaveland Order:...
-
Ordered Rivet Fan
-
Ordered 4" Yoke...
-
Ordered 2"...
-
Ordered Die Grinder...
-
Ordered Trailing...
-
Ordered mandrel...
-
Ordered Compressor...
-
Ordered Tool Kit...
-
Air Drill and...
Records
- (3)
-
Renewal of N-Number...
-
N-Number Reservation...
-
Reserve N-Number
Auto Entry
Supplies
- (6)
-
Ordered pro seal and...
-
Ordered Double SIded...
-
Tools: Cleaveland...
-
Vans: Tank Sealant,...
-
Cleaveland Tool:...
-
Cleaveland: 1"...
Insurance
- (2)
-
Insurance: Builders...
-
Builder's Risk...
Builder Name:
Dustin Newton
-
Project:
Vans - RV-14A
Total Hours:
1178.7
Total Flight Time:
Start/Last Date:
Apr 09, 2021 - No Finish Date
Engine:
Lycoming IO-390-119EXP
Propeller:
TBD
Panel:
AFS/Dynon/Avidyne
Friendly URL:
https://eaabuilderslog.org?s=NewtonRV-14A
Home or Last Project Picture
Mar 04, 2023
Leading Edge: install left wing landing light and lens
- (2.5 hours)
Category: 17:Outbd LdgEdge
1A0E388B-96FD-4A7C-94B1-2C72726CA6A3.jpeg
Feb 24, 2023
Outboard Leading Edge: Completed Riveting the outboard leading edge on the left wing
- (2.3 hours)
Category: 17:Outbd LdgEdge
Feb 20, 2023
Outboard leading edge: begin riveting left wing leading edge
- (4.3 hours)
Category: 17:Outbd LdgEdge
Feb 19, 2023
Leading edge: landing light right wing
- (7.0 hours)
Category: 17:Outbd LdgEdge
09475721-5DA8-4906-ACBF-AD91E4695474.jpeg
CD921095-3F05-42F9-8EF0-D749A1BC1542.jpeg
FE9CD987-02E8-4191-A255-B8C05530E2D6.jpeg
5E2A7DD7-16E4-4ADF-A6C1-E87CF891E1FA.jpeg
5821309F-2FEA-423D-840E-A96D82078CE2.jpeg
F3BF8E33-625B-40B6-A402-3D34262C4DCD.jpeg
7C96BEF0-8382-473F-8EF1-5E68BC7E8B6F.jpeg
C8D60C8D-416A-4605-BB36-089BBC8381BF.jpeg
Feb 12, 2023
Outboard Leading Edges: Right wing completed riveting to spar
- (1.5 hours)
Category: 17:Outbd LdgEdge
Feb 05, 2023
Outboard Leading Edge: Fitting of leading edge to wing assy (Right)
- (2.3 hours)
Category: 17:Outbd LdgEdge
Still not complete. Having interference between the main wing top skin and the top edge of the leading edge skin. Slowly sanding and rechecking, one more iteration should be sufficient.
Oct 23, 2022
Leading Edges - completed riveting
- (4.5 hours)
Category: 17:Outbd LdgEdge
Completed Riveting j-stiffeners. Assembled stall warner but one of the screws broke so I had to order a replacement.
Oct 22, 2022
Leading Edge: completed riveting ribs, riveted left j stiffener, both landing light brackets installed.
- (8.1 hours)
Category: 17:Outbd LdgEdge
2BC97F1B-A7C5-4180-8C31-353759478248.jpeg
0A0A45FA-DB7B-4265-912A-B808F84DF212.jpeg
6BFCF66D-2191-4C40-969D-A69A12CF9956.jpeg
Oct 21, 2022
Leading Exge: continue riveting
- (2.8 hours)
Category: 17:Outbd LdgEdge
Oct 20, 2022
Leading Edge: Continue Riveting
- (.4 hour)
Category: 17:Outbd LdgEdge
Oct 19, 2022
Leading Edge: Continue Riveting
- (1.6 hours)
Category: 17:Outbd LdgEdge
Oct 18, 2022
Leading Edge: Continue riveting
- (.8 hour)
Category: 17:Outbd LdgEdge
Oct 17, 2022
Leading Edge: Continue Riveting Skings
- (.8 hour)
Category: 17:Outbd LdgEdge
Oct 14, 2022
Leading Edge: Cleco assemblies together, begin riveting
- (3.5 hours)
Category: 17:Outbd LdgEdge
79D0799E-D606-45C1-8971-BAE810BE2AD2.jpeg
ED02FD69-7595-4096-9DAF-F45174761BB5.jpeg
Oct 16, 2022
Leading Edge: Continue Riveting
- (2.6 hours)
Category: 17:Outbd LdgEdge
Oct 15, 2022
Leading Edge: Continue riveting
- (1.2 hours)
Category: 17:Outbd LdgEdge
Oct 13, 2022
Leading Edge: Mask and paint landing light bays
- (1.0 hour)
Category: 17:Outbd LdgEdge
Painted landing light bays with flat black paint.
Oct 12, 2022
Leading Edge: Prime Skins
- (.7 hour)
Category: 17:Outbd LdgEdge
Oct 10, 2022
Leading Edge: Dimple Right Skin
- (1.0 hour)
Category: 17:Outbd LdgEdge
Oct 11, 2022
Leading Edge: Dimple Left Skin
- (.9 hour)
Category: 17:Outbd LdgEdge
Oct 06, 2022
Leading Edge: finish deburring skins, begin dimpling skins
- (.8 hour)
Category: 17:Outbd LdgEdge
Oct 01, 2022
Leading Edge: Rivet nutplates on various components and paint those in the landing light rib bay.
- (5.0 hours)
Category: 17:Outbd LdgEdge
F08B556D-EEB1-414F-B425-581BAC03B7DB.jpeg
D8A468DC-3952-4B25-B5BD-A9B99DDB831B.jpeg
Oct 02, 2022
Leading Edge: Finish riveting nutplates and scuff skins
- (7.0 hours)
Category: 17:Outbd LdgEdge
Sep 30, 2022
Leading Edge: finish prepping parts and prime
- (3.0 hours)
Category: 17:Outbd LdgEdge
002BC991-B046-4C15-95C8-122CEF6169EB.jpeg
Sep 29, 2022
Leading Edge: Debur and dimple j-stiffeners, ribs (extra holes that were drilled), and landing light lens brackets
- (1.0 hour)
Category: 17:Outbd LdgEdge
Sep 28, 2022
Leading Edge: Remove Clecos from left side
- (.2 hour)
Category: 17:Outbd LdgEdge
Sep 26, 2022
Leading Edge: Remove clecos from right side assy
- (.2 hour)
Category: 17:Outbd LdgEdge
Sep 25, 2022
Leading Edge: Finish Prepping Ribs (2), cleco ribs and fabricate j-stiffeners
- (7.5 hours)
Category: 17:Outbd LdgEdge
D8FF34EF-B1BD-49C9-8391-6E1631A5C602.jpeg
9F7F4B4D-CDC9-4D3E-9C9A-72783CD1F532.jpeg
8901A934-5EE5-458A-A218-62723C2128FF.jpeg
Sep 24, 2022
Leading Edge: Prepping Ribs (5)
- (5.0 hours)
Category: 17:Outbd LdgEdge
Sep 22, 2022
Leading Edge: continue prepping ribs (4) finished left side ribs
- (3.0 hours)
Category: 17:Outbd LdgEdge
Sep 21, 2022
Leading Edge: Continue prepping ribs (2)
- (1.4 hours)
Category: 17:Outbd LdgEdge
Sep 20, 2022
Leading Edge: begin prepping ribs (1 finished)
- (.9 hour)
Category: 17:Outbd LdgEdge
D6B8A098-8025-410F-A13C-16C37C518595.jpeg
Sep 18, 2022
Leading edge: organize ribs and setup shop
- (1.0 hour)
Category: 17:Outbd LdgEdge
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.